STRATHCONA GARDENS · MY RESPONSE

CHEK mixed up the letters.

The story puts an August call for separate votes before my July reply, without telling readers the dates.

Walk me through it My response · October 11, 2026

THE ERROR, IN PLAIN ENGLISH

My July reply could not have answered an August letter.

The dispute: who pays for Strathcona Gardens, and whether each community should have its own vote.

What CHEK did

The article introduces the Minister’s July 23 letter, then quotes her August 31 recommendation for separate votes without saying it is a different letter. It later presents our July 31 reply without that date.

What I actually answered

I co-signed the July 31 reply to the July 23 questions. The recommendation CHEK quotes came on August 31, a month later.

WHY I’M CHALLENGING IT

That presentation can make my earlier reply look like a rejection of the later recommendation. It wasn’t a response to that letter. It couldn’t have been.

Separate voting was already raised in July. My point is the mixed-up sequence, not that the Minister had no concerns.

Read CHEK’s October 8 article ↗
Watch the coverage 27 SECONDS, THEN THE ORIGINAL LETTERS
THE COVERAGE → THE RECORD

A short clip. Three dates. The letters beside every point.

THE REPORT

NOW WATCH WHAT AIRED

Two letters.
No explanation of the switch.

CHEK News · Dean Stoltz · October 8, 202627 sec · original 1:51–2:18
Full report and context ↗
HERE’S THE ISSUE

The sequence
gets lost.

The clip switches letters without explaining the change. The article quotes August’s recommendation, then presents my July reply without its date. That can make my earlier reply read as an answer to the later letter.

Read CHEK’s full story ↗
Now rewind to July FOLLOW THE ORIGINAL LETTERS
↶ BEFORE THE REPORT · THE DOCUMENTED TIMELINE
QUESTIONS

CHEK TV SAID Broadcast summary

Describes a letter, while showing July’s questions and then August’s preference.

Watch that switch ↑

WHAT REALLY HAPPENED

Two ministerial letters.
Different dates.

July 23 raised concerns and asked for answers. The preference shown in the clip is from August 31.

Eight days later: my reply
MY REPLY

CHEK TV SAID Article sequence

Presents our reply after that preference, without identifying the reply’s date.

WHAT REALLY HAPPENED

My reply
came first.

I co-signed it on July 31, answering July 23. It cannot be a response to a letter written a month later.

Then came the later recommendation
PREFERENCE

CHEK TV SAID Quotes the Minister

“It is my preference…”

The article carries this wording, but does not identify its August 31 date.

Check the article ↗

WHAT REALLY HAPPENED

The missing date:
August 31.

The Minister preferred separate approval, while acknowledging the Board’s discretion. CHEK includes that qualification. What the article leaves out here is the August 31 date.

What the dates do not settle
THE
LIMIT

A SEPARATE QUESTION

Who received the letters?

CHEK also reports an allegation that letters were not shared with directors. The dates do not settle who received what, or when. I won’t pretend they do.

THE ORIGINAL RECORD

Close this window to continue where you left off.